Cut the new gutter pieces using the measurements you took in step one.
How to install gutter diy.
To do this place a nail at each end of the gutter run and tie a string between the nails.
When installing gutters set the proper slope by driving a nail 1 2 in.
The outlet connects the downspout with the gutter and should be attached via screws or rivets depending on the manufacturer.
Measure the fascia to determine the length of the gutter.
After aligning the gutter with the string affix a hanger at the downspout end.
Check for level and then drop the string 1 inch every 20 feet.
Once all of the pieces have been cut measure a hole for each outlet plug.
How to install gutters step 1.
Gutter components are made by several manufacturers and are available through lumberyards.
The slope of a gutter to the downspout should drop 1 inch for every 20 feet of run.
Saw gutter to.
Getting started part.
For every 10 feet of gutter from this measurement and mark this distance at the low end of the gutter run.
Below the shingles on the high side of the gutter run.
You can cut the pieces with a hacksaw or tin snips.
If you have a choice between steel and aluminum systems which is best.
Snap layout lines photo by mary beth montgomery mark the highest point of the gutter run on the fascia 1 inches.
Apply gutter sealant to an end cap then press the cap onto one end of the gutter.
Steel is stronger and.
Measure and record the distance from the bottom of the fascia board to this nail.