Clip the starting point of the cable to a.
How to install gutter heaters.
Cut a two inch long notch in the front lip of the gutter with tin snips to join a rain gutter section.
Snap the sections together.
Secure the cable to the shingle with one of the provided cable clips.
Slide the splices on as far as they ll go.
Use a square and pencil to mark the gutter length and cut to the line.
Installing gutter heat tape is meant for the prevention of the ice dams not for getting rid of them once already formed.
Run the cable back.
Project step by step 20 cutting the gutter.
It s much easier to join sections on the ground than to work from the top of a ladder.
Route the cable from the electrical outlet to the starting point on the roof.
Begin by installing a slip joint splice on each end of an inside corner fitting.