You nail through the batten to only one edge of the board and let the other board edge float under the next batten he writes.
How to install hardie board and batten siding.
Join factory edges and place the cut edges against the corner trim boards.
If your sheathing is not solid you will need to first attach horizontal furring strips.
Nebraska state capitol building rise into view.
In addition to applying stain to both sides and all edges nailing both boards and battens correctly also is key.
Be sure to go to the 14th flooring statement deck for a nice view of lincoln and the surrounding countryside.
Homesteaders and farmers would use sawmills to cut the long boards and the battens were put in place to make the structure as airtight as possible.
Priming or staining prior to installing your hardie board and batten is a must since this process keeps their quality from being compromised.
With a helper expect to spend a day installing 800 square feet of siding.
Cut a piece of 6 inch wide steel coil trim about 1 inch longer than the width of a siding board and place it behind the joint.
Before you begin cover the sheathing with building wrap and install trim boards and flashings.
Board and batten can be installed onto solid plywood or osb sheathing.
Hardie board installation will require joints between planks.
Caulking joints are unnecessary but flashing behind the joints is required.
Prime or stain all surfaces of the board and batten.
Since the primer or stain acts as a preservative it gives your board and batten added toughness that will keep them from deteriorating quickly.
Rdesigns suggests the traditional method.