Before installing the shakes the roofer covers the roof deck with 15 or 30 pound roofing felt.
How to install metro shake roofing.
Installing the cedar shingles.
Take care the first piece is aligned precisely perpendicular square to the edge.
Experts recommend that you work diagonally and raising each row of shingles gradually.
Install drip edge extended eave trim and valley flashing.
A battenless alternative that offers a fast installation time.
You should start your metal shingles installation with half a shingle or in accordance with your metal shingles installation manual which should be system specific starting from the left of the starter flashing or gable.
Each panel is forged with deep wood grain impressions creating an exceptionally strong secure steel roof covering for any architectural style.
Metroshake the batten less alternative eliminates costly wood battens and allows faster installation times.
Lap rows of 36 inch wide felt using the provided lap lines as guides.
Always begin working at the point with the longest peak to eave distance.
Layout fabricate overlap and secure slate per manufacturer instructions.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof line.
Then lay down a layer of roofing felt.
Use a crowbar nail bar or roofing shovel to loosen the old shingles.
Add the metal panels.
Allied roofing sheet metal inc.
All metro products provide heavy duty warranty.
Red roof allied roofing and sheet metal metro roof products duration.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Start nailing the new shingles at the lower edge of the roof.
Check the felt paper.
Remove these old shingles and loose roofing nails from the roof.