Full installation of classicbond epdm roof with sure edge trims.
How to install termination bar with epdm roofing.
For more information please visit http.
A termination bar must be cut at inside and outside corners.
Fold back the rubber membrane over the surface to be joined to.
Apply termination tape to connect the wall and roof tapes so the entire rubber perimeter is sealed.
If using water based adhesive the technique involves spreading adhesive onto the roof using a paint roller in sections of three or four feet across the leading edge.
Position termination bar on.
Pull the rubber from the shipping box and drag it across the roof.
Start with the edge facing the wall and work towards the roof s edge.
Metal edge termination epdm detail.
How to install a termination bar video and installation guide fold back epdm and apply water cut off mastic.
The bar is 25mm x 3m and has pre punched holes every 150mm on center.
Installing z bar flashing on tpo termination bar.
Apply termination tape to the wall just below the line.
Do not bend the bar around the corners.
Install the termination bar with an acceptable hammer plug system at 200 mm o c.
Ensure that the rubber membrane extends a minimum of 25mm on to the.
Find out how to join an epdm rubber membrane to an existing roofing material such as felt using a termination bar.
Prior to installation of the termination bar pull back the topside of the membrane flashing 20 mm and apply a bead of water block between the membrane and the wall.
With a pencil or chalk line mark the desired rubber perimeter on the wall and roof edges.