How to install vinyl shake siding installing vinyl shake siding.
How to install wood shake siding.
Start at the bottom of the wall at one end.
Install the felt paper with minimum 6 inch overlaps on vertical joints 2 inches on horizontal laps and 4 inches wrapped each way at inside and outside corners.
Like most vinyl siding vinyl shake installation starts with the application of the.
How to install staggered cedar shake siding 1.
Align the thick lower edge of a cedar shake at the lower edge of the.
Begin the installation by wrapping the house with a waterproof membrane either 15 to 30 pound felt or semi permeable house wrap.
How to do it.
Using the nail gun drive a single nail at one end of a cedar shake piece of siding and then carefully align it along the snap line attaching another nail at the opposite end.
Apply overlapping horizontal rows of building paper onto the shear wall using a staple gun with 3 8 inch staples.
Underlayment requirements for wood shingles the cedar shake and shingle bureau recommends installation over type 30 asphalt felt underlayment for red cedar shingles and shakes.
Tom silva shows the apprentices how to properly install wood shingles.
Pop a level chalk line for the starter strip an inch or two above the bottom of the.
Install the windows and door jambs so you can trim the doors windows and corners of the house with wood trim.
Begin installation in corner.
How to install cedar shingle siding.