From the ends of the plank.
How to nail hardie plank siding.
It is important that they are not sunk below the surface of the boards so that they create a weather tight seal.
Do all the corners before continuing.
The original installer might have accidentally installed a nail too close to the edge of the siding causing a crack.
Hold a hardieplank siding board with the top edge against the chalk line and 1 8 inch away from the corner trim.
Hardie board siding usually cracks due to poor installation.
Pick out stainless steel or hot dipped galvanized nails size 6d 1 1 2 inch long siding nails and 2 inch long siding nails in the quantity you need for your project.
You can easily fix it by cleaning it and then using caulk to patch the gap.
Plank hz10 pdf pay particular attention to the section about fastening type of nails and when to use caulk.
Nail it to the house framing with two siding nails every 16 inches.
Space the nails 16 inches apart.
This old house general contractor tom silva shares his secrets for working with fiber cement siding.
Please recommend something which will please us both.
Hammer the nails approximately 3 4 inch to 1 inch up from the bottom edge of the board that is directly above the loose siding.
I want to put some plaques and trellis up on our hardiplank siding but dh says any nail will invite problems.
Learn how to nail hardieplank lap siding with this instructional video from james hardie.
Hardie plank siding has a nail line across the top of the board that is 1 down from the top and nails are supposed to fall between and 1 from the top of the board to give the best hold.
Surely there must be a safe way.
Any lower and you might see a few nail heads poking through the bottom of the next board any higher and your siding is likely to be loose and could even rattle in the wind.
Fasteners shall be installed between 1 in.
Blind nailing preferred installation james hardie prefers and recommends installation of hardieplank lap siding by the blind nailing technique such that fasteners are hidden by the course above.
From the top edge and no closer than 3 8 in.
See below for a shopping list and tools subscribe to.
Nail the board to the house every 16 to 24 inches with a roofing nail along the nail line printed on the top of the siding board.