Each row should overlap the one below it by 1 4 inch 7.
How to redo roof shingles.
Damaged or old valley flashing and drip edging is.
Divide the total square footage by the different amounts for felt shingle or plywood.
If the shingles fail at any point during that time span expect a check for a prorated amount.
If there are curled shingles on your roof use cement to put the shingles back in their original position.
Nail a horizontal row of shingles over the drip edge.
Take care not to crack or chip the shingles when you push them back into place.
Hammer the nail into the top part of each shingle.
Remove the existing shingles felt and nails from the roof with a pry bar.
If not replace bad wood with new plywood sheathing or 1.
Start at the top of the roof inserting the pry bar under the shingles and pushing downward.
Remove all existing shingles deposit them in a roll off dumpster.
Laminated versions carry a lifetime warranty which means for as long as you own the house or for a maximum of 40 to 50 years.
The downward motion forces.
Make minor repairs on the roof if it is in good condition.
One bundle of a 25 or 30 year shingle covers 33 3 sq.
The overall process followed by the roofing crew goes like this.
Feet 30 felt covers about 215 sq.
Replacing shingle roof how to place new roof how to remove old roof how to remove flashings allied roofing and sheet metal inc have been in roof repair.
Apply caulking material on the small holes and cracks on the asphalt shingles then let it dry completely.
Shingle coverage three tab shingles usually carry a 20 25 or 30 year warranty against manufacturing defects.