Very little equipment is required and three or four workers can complete most applications.
How to strip cold applied roofing.
Lap the base sheet 2 51 mm and mechanically fasten with four equally spaced rows of senco tape and n12 bab or n12 fab staples spaced at 9 229 mm o c.
Scrape underneath the material until you feel the nails stop the shovel.
Applied to the edge strip and the overlying strip has been pressed down.
All roof membrane components are in small enough packages that they may be transported by elevator.
With no kettles or disagreeable odor the burmastic system is ideal for restoration projects on buildings that must remain occupied during a roofing.
In three rows equally spaced in the field of the sheet.
Centered over the 2 51 mm wide laps and at 9 229 mm o c.
One of the primary advantages of cold process roof systems is their relative ease of application.
Brush away any loose mineral chippings from the top of the gutter drips.
Do not bend the strips in cold weather without first warming them.
When you need the durability and exceptional waterproofing capability of a multi ply built up roof but using a system with hot materials is not the right choice tremco roofing s burmastic cold applied built up roof system is the way to go.
The systems can be completed as new or remedial construction or can be applied over existing smooth surfaced roof systems in an effort to extend the service.
Pry under the edge of the remaining material starting on the downhill side using the roofing shingle shovel.
Trim butt and nail the sheets as they meet at a hip or ridge.
Next cut 12 x 36 strips from the roll roofing and bend them lengthwise to lay 6 on each side of the joint.