The manufacturer requires proper fastening of the product to the home.
How to nail lp smart siding.
Once you have installed the majority of the trim you re ready to begin installing the siding.
Shim siding at studs as needed to avoid drawing siding against uneven walls.
Contractors watch this video to learn about the advantages of using lp smartside trim siding products and how to install them.
The nail heads should be driven to the top of the siding only and not below where visible product fibers can be seen.
Long enough to fully penetrate structural.
See diagram 3c for edge nailing all nail holes must be pre drilled.
The nails should be long enough to penetrate the structural framing by at least one and one half inches.
Lp smartside strand substrate cedar shake.
Apply nails to meet the specifications in the general application equipment section in this document.
Never nail from the ends of the siding toward the middle.
Smartside siding instructions wall preparation.
Because siding is considered a cladding material it is necessary to have a weather or vapor.
Do not overdrive nails.
Sensitive to moisture smartside siding requires proper wall preparation to protect it from moisture.
Do not attempt to edge nail without pre drilling.
See diagrams 6e and 6f fastener length.
Nail from the center of the siding toward the ends or from one end to the other end.
How to install lp siding starting with the trim.
Nail head should seat firmly to face of siding but not be overdriven to distort the.
38 series cedar shake.
As in standard construction practices install smartside siding by nailing to studs spaced 16.
3 16 gap at butt joints between horizontal sections and where the siding meets doors windows and corner trim.
In this instructional video we demonstrate how to install lp smartside lap siding using h molding which gives a more professional look with equal functiona.